Assignment 12 ITC280

This was basically done by the end of class.  I have done all the downloading and uploading to the server to make it all work in class.  At home I updated the spreadsheet, construction page  and add the extra code to my travel log list and view page. I also created all the thumbnails and wrote the blog entry.  This all took about a three hours.  That might seem time-consuming but most of this was creating the thumbnails.  I also had a problem with my blog loading slow and so there was some up-keeping there as well.

Update 03/16/2011

I spent this morning dealing with cleaning up the site.

Things I accomplished

I commented out the model pages for the nav in the config file.
Centered the form in the contact page.
Changed the assignment 10 link to Sign In on the nav.
Changed the text that appears on every page to something more personal.
Moved sidebar 2 to the footer_inc file
cleaned up the theme css file

Things I didn’t accomplished

Tried to change the css but was getting odd results so I will have to work on that
Tried to change the h tag on the pages to read for example index and not index.php but haven’t figured outhow to change the php to drop the .php
wanted to change the text on the travel log  pages but didn’t know what to change it to
need to really work on the css. It is bothering me that all the text is not formatted and such.

 

 

 

Leave a Reply

Your email address will not be published.